PROJECT NAME |
DESCRIPTION OF WORKS |
Molong Health One |
- Construction of new Community Health Centre at Molong including Professional Consultation Rooms, Pre-School Facilities and Administration Offices
|
Gunnedah Nursing Home |
- 30 Suite extension to Lundie House Gunnedah which included the administration building and multi purpose building for aged care
|
Orange TAFE |
- Construction of a new Administration Block for Rural Studies, Veterinary Science Laboratories and Geneal Purpose classrooms for Orange TAFE
|
Resitech (29 housing Units - Dubbo) |
- Resitech (29 housing Units - Dubbo) DPC was contracted to carry out the construction of (3) projects consisting of a total of 29 residential units for aged care on three separate locations throughout Dubbo
|
Tottenham Health Care |
- Tottenham Health Care New health care facility for Tottenham - MPS builidngs with GP area, residential aged and emergency department.
|
Village Life Limited and Taree). |
- DPC was contracted by Village Life on five (5) occasions to carry out the construction of Units (52), the Managers residence, the community kitchen and community area, covered walkways and landscaping to each site in Dubbo (Stages 1 and 2), Bathurst, Goulburn and Taree).
|
Dubbo City Council (Airport) |
- Re-development and upgrade of the Dubbo City Airport Building, Cooreena Road, Dubbo
|
Dubbo City Council (Civic Administration Building) |
- Re-development and upgrade of the Dubbo City Council Civic Administration Building after the building was extensively damaged by fire. An additional floor to the building was also constructed.
|
RSL Aged Care Assosciation |
- Stage 9 of the RSL Retirement Village, Dubbo. Total of 30 units constructed for this stage at Dubbo
|
Resitech Dubbo - Package B |
- Caroline, Jubilee, Gilbert & High Streets - Demolition of existing houses and construction of 6 Aged Care Units at Jubilee Street, Demolition of existing houses and construction of 4 Aged Care Units at Caroline Street and Demolition of existing houses and construction of 4 Aged Care Units at High/Gilbert Streets
|
Kintyre Stage 2 |
- Construction of 11 2 & 3 Bedrooms Houses of Brick Veneer with Colourbond Roofing and full Landscaping including access roads as part of Kintyre Retirement and Country Living Estate
|